Construction Toolkit

Survey Timeline Tracker

Track every critical survey stage from design to final inspection. Check off items as you go โ€” and never miss a step that could freeze your project.

Overall Progress 0%
Design
Pre-Build
During
Final
๐Ÿ“Š Project Status
10
Total Items
0
Completed
10
Remaining
4
Critical Path
Next Action Start with Stage 1 โ€” Order your Boundary and Topographic Surveys before any design work begins.
1
Stage 1 โ€” Initial Survey
Design Phase ยท Before blueprints are drawn
Design Phase โ–พ
"You can't draw the map without knowing the territory."
โœ“
Boundary Survey CRITICAL PATH
Confirms the exact legal property lines. Must be completed before any design work. Prevents building on a neighbor's property.
โœ“
Topographic Survey CRITICAL PATH
Maps ground elevations across the entire property. Architects need this to create accurate blueprints. Some cities also require elevation data for adjacent buildings.
2
Stage 2 โ€” Early Construction Survey
Pre-Build ยท Right before breaking ground
Pre-Build โ–พ
3
Stage 3 โ€” During Construction Survey
Mid-Project ยท After the slab is poured
During Build โ–พ
4
Stage 4 โ€” Final Survey
Post-Build ยท Before Certificate of Occupancy
Final โ–พ